reflection
Getting comfortable
Ready for installation tomorrow...
wrapped tightly in multiple layers of plastic...
then again in electrical tape
soldered to IR illuminator and wrapped in heat shrink tubing....
ready to install.... the rectifier will be covered lightly with mulch elevated from ground level. It won't be sitting underground so should drain pretty well.
wrapped tightly in multiple layers of plastic...
then again in electrical tape
soldered to IR illuminator and wrapped in heat shrink tubing....
ready to install.... the rectifier will be covered lightly with mulch elevated from ground level. It won't be sitting underground so should drain pretty well.