Hi,
i need help. I´ve been searching and reading a lot of posts, but i doesn´t found the right answer.
I´ve got Blue Iris running on a Dell R230, Xeon E3-1200 V5, W2016 Server on a ESXI.
Actuall 3 Cams, two h.264 and one h.265. The CPU-Load with 2 Threads ~50%. Yes i can raise the the Cores and Threats even more.
But the question is, i want generally reduce the CPU-Load.
Should i change the CPU to a Xeon E3-1225 v6 with Quick-Sync (Passthrough the EXSI to the W2016)
or it´s possible to reduce with an Gefoce GT 710? I´ve got only an PCI x8.
I want to increase the nuber of cameras to 6. (More H.265)
Thanks for the help.
CU
i need help. I´ve been searching and reading a lot of posts, but i doesn´t found the right answer.
I´ve got Blue Iris running on a Dell R230, Xeon E3-1200 V5, W2016 Server on a ESXI.
Actuall 3 Cams, two h.264 and one h.265. The CPU-Load with 2 Threads ~50%. Yes i can raise the the Cores and Threats even more.
But the question is, i want generally reduce the CPU-Load.
Should i change the CPU to a Xeon E3-1225 v6 with Quick-Sync (Passthrough the EXSI to the W2016)
or it´s possible to reduce with an Gefoce GT 710? I´ve got only an PCI x8.
I want to increase the nuber of cameras to 6. (More H.265)
Thanks for the help.
CU