- Jun 18, 2014
- 218
- 315
These aren't final install photos or anything just progress but hopefully this is the right subforum.
Thought it be be interesting to some of you.
Trenching from the house to a front gate for multiple utilities on 6 acres of land. Front Gate Camera, future intercom system and possible future anything so there will be multiple runs as extras on top of the couple things we know will be installed. Of course running everything burial rated inside of conduit that will be glued & sealed. (Still use burial rated incase water somehow gets in, or an animal eats a hole in the conduit and water then finds its way in... etc...)
Probably 400-500ft to the front gate, there's a detached garage at the rear of the property where there's a rear gate as well. We'll have 4 cameras there too. We'll also trench to that, which is probably another 300ft.
This is a fun install!
Thought it be be interesting to some of you.
Trenching from the house to a front gate for multiple utilities on 6 acres of land. Front Gate Camera, future intercom system and possible future anything so there will be multiple runs as extras on top of the couple things we know will be installed. Of course running everything burial rated inside of conduit that will be glued & sealed. (Still use burial rated incase water somehow gets in, or an animal eats a hole in the conduit and water then finds its way in... etc...)
Probably 400-500ft to the front gate, there's a detached garage at the rear of the property where there's a rear gate as well. We'll have 4 cameras there too. We'll also trench to that, which is probably another 300ft.
This is a fun install!