Mike A.
Known around here
- May 6, 2017
- 4,142
- 6,946
OK, so in BI I have:
- PTZ enabled.
- Camera's digital input or motion checked under triggers.
- Get events with PullPointSubscription checked.
- Send a push notification to mobile app configured with a .wav file.
In the cam I have:
- PIR Alarm checked.
- The alarm schedule set all purple.
- Under Linkage Method, Trigger Alarm Output checked, A->1 under that checked (also Trigger Channel, A1 checked).
- Nothing checked under Normal Linkage.
Should that do it? Still not working for me.
- PTZ enabled.
- Camera's digital input or motion checked under triggers.
- Get events with PullPointSubscription checked.
- Send a push notification to mobile app configured with a .wav file.
In the cam I have:
- PIR Alarm checked.
- The alarm schedule set all purple.
- Under Linkage Method, Trigger Alarm Output checked, A->1 under that checked (also Trigger Channel, A1 checked).
- Nothing checked under Normal Linkage.
Should that do it? Still not working for me.